Wake the Tiger
Installing and commissioning technical rooms.
We installed screens, fitted mounts and troubleshot selected rooms at Wake the Tiger’s London venue, under its technical directors.

The challenge
The venue needed commissioning support at short notice, with limited documentation. Its technical directors needed extra hands on individual rooms while the rest of the site was being completed.
What changed
The selected rooms were brought into operation. Taking on this work freed the internal team to concentrate on the rest of the site.
What END delivered
- Screen and mount installation
- Room-level technical troubleshooting
- Commissioning support
Following the technical directors’ instructions, we installed screens and mounts, resolved issues room by room and helped commission the selected spaces.
Watch the film · 0:34
Inside the London build
Wake the Tiger’s introduction to the London site during construction. Published by the venue; shown here as context for the build.
Watch on YouTubeWork with END Corp.
Planning an installation or event?
Tell us which systems you’re using, what needs to work and when. We’ll discuss the technical work and support you need.
hello@endcorp.co